Domicile buildings in Taulov Dry Port
A.P. Moller - Maersk
Building facts:
- Address: Taulov Dry Port, 7000 Fredericia
- Occupancy: 2024
- Turnkey contractor: DS Flexhal
- Description: 40,000 m² low-emission warehouse with 12 meter ceiling height. The building will be built with solar cells on the large roof surfaces, which supply the building with green electricity and at the same time supply surplus power to supply the local area.
Lallemand
Building facts:
- Address: Baronessens Kvarter 6, 7000 Fredericia
- Construction start: May 2023
- Occupancy: April 2024
- Turnkey contractor: DS Flexhal
- Description: 10,959 m² divided into 10,159 m² of dry goods storage and 800 m² of administration.
DLG
Building facts:
- Address: Baronessens Kvarter 4, 7000 Fredericia
- Construction start: December 2018
- Move-in: December 2019
- Turnkey contractor: DS Flexhal
- Description: 28,950 m² warehouse and logistics hall. Containing bagging facilities, chemical area, storage room and well-functioning access and loading facilities on the site. Administration on 430 m²
FSG Foods
Building facts:
- Address: Prinsessens Kvarter 5, 7000 Fredericia
- Construction start: May 2020
- Move-in: May 2021
- Turnkey contractor: KT Erhvervsbyg
- Description: 5,800 m² divided into 3,220 m² of dry goods storage, 1,625 m² of frozen and cold storage and 835 m² of administration.
Otto Schachner
Building facts:
- Address: Prinsessens Kvarter 2, 7000 Fredericia
- Construction start: Mid 2015
- Move-in: Mid 2016
- Turnkey contractor: Gråkjær
- Description: 4,000 m² warehouse and 650 m² office facilities on two floors with showroom and canteen for employees.